1.
Nawang Wulan LT. Analisis Optimasi Waktu Dan Biaya Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off. Jureng [Internet]. 2021Oct.4 [cited 2025Apr.24];12(2):47-56. Available from: https://engineering.upstegal.ac.id/index.php/Jureng/article/view/73